Day 1 07:00 0 m³

Pour

Ready-mixed concrete has about 90 minutes from the plant to the slab. Once a pour starts, it is owed a steady stream of mixers: a long break leaves a cold joint. Do not start a pour you cannot finish.

How to play
  • Drag from the plant to lay road tiles. Bridges cost bridge tiles. Use the eraser, or the right mouse button, to lift road.
  • Spoil trucks haul each new hole to the dump. When the hole is dug, the cage goes in and the site shows a start button.
  • Tap start when you are ready. The plant then sends mixers on its own. The ring around the slab shows the break it can still take, and turns red when it is running out.
  • A load more than 90 minutes old is wasted. A slab left too long without concrete gets a cold joint. Three cold joints end the run.
  • Each week, pick one: another plant, a pump (reaches past buildings and pours faster), retarder (more time), or more road.
  • Your score is the cubic metres in finished slabs. The season ends with the first frost.

Week 2. Pick one

Tap to carry on